BLACKOUT MAP
All websitesFollow @Blackoutmap_net on X

Is evm.ee down?

Visit site

No problems

Our last check reached it, and nobody is reporting problems right now.

  • Our check: up, 59 min ago from Germany · answered in 84 ms
  • 0 problem reports in the last 30 minutes
  • Hosted in Netherlands
Comments
0problem reports, last 24 hours
100%uptime in our checks, last 24 hours
84 msresponse time
1countries where it is among the most visited

Problem reports, last 24 hours

No reports

reports per 15 minutes usual level our check: up our check: down

Problem reports for evm.ee, last 24 hours

Reports per 15 minutes, and what our own checks found. Times are in your time zone.

reports per 15 minutes usual level our check: up our check: down

Use this chart

Download the image for an article, or put the live card on your website. Both show where the data comes from.

Chart image

A snapshot of right now: 1200 × 675 pixels, times in UTC.

Problem reports for evm.ee, last 24 hours
Download image

Live card

Updates itself every minute on your page.

What doesn't work on evm.ee?

Anonymous: we keep the problem, the time and your country, not your address.

evm.ee: our checks and outages

We check evm.ee about once a day from our server in Germany, and again within a minute whenever someone reports a problem. Since October 21, 2026, none of our checks found it down. Nobody reported a problem with it here in the last 30 days.

About this site

Address
85.222.234.14
Last HTTP status
200

Among the most visited sites in

Chrome UX Report rank groups (Google), September 2026.

Not loading for you? Things to try

  1. Reload, or open it in a private window. That skips your browser’s cache and extensions.
  2. Try another network. Switch between Wi-Fi and mobile data: if it works on one, the problem is on the other.
  3. Restart your router, or use a public DNS. For example 1.1.1.1 or 8.8.8.8: a broken DNS makes sites "disappear".
  4. Check your internet connection itself. See Is the internet down in United States? on our live map.
  5. Many reports here? Then it is not you. Wait a little and check back: you can press "Check again" once an hour.

Popular websites in United States

Comments

Is evm.ee working for you? Tell others what you see: where you are, your provider, what fails.

Sign in with Google or your e-mail address to comment.

    No comments yet. Be the first to say how evm.ee works for you.

    Your name and a country flag are shown, your e-mail address never. Privacy policy

    Comment rules

    • Be kind: no insults, hate or threats.
    • Stay on topic: how evm.ee works for you.
    • No links, e-mail addresses, phone numbers or messenger names.
    • No swearing, and no rude or misleading names.
    • No spam or advertising.

    Comments that break the rules are removed, and repeat offenders are blocked. See something wrong? Press Report. Terms of use

    Sign in to comment

    One account for all of Blackout Map. We only show your name and country.

    By signing in you agree to our Terms of use and Privacy policy.

    Report this comment

    We read every report. For illegal content, tell us why it is illegal; we answer by e-mail when you write to us.

    Share

    A website can be down for everyone, or only unreachable from some places. Our result is from our server in Germany; sites that look down are checked again a few seconds later, and our live checks also ask a second server in another country. About our checks, and how to opt out